1
/
of
9
내 스토어
GPS Tracker for Dogs – Smart Dog Collar & Pet Tracker with Real-Time Location, No Monthly Fee, Unlimited Range (iOS Only) – Fits Small to Large Dogs(Locator Included) (Black)
GPS Tracker for Dogs – Smart Dog Collar & Pet Tracker with Real-Time Location, No Monthly Fee, Unlimited Range (iOS Only) – Fits Small to Large Dogs(Locator Included) (Black)
Regular price
$59.39 USD
Regular price
Sale price
$59.39 USD
Shipping calculated at checkout.
About This
- ⚫🏷️No Subscription Fees & Free App Access – Enjoy worry-free tracking with our pet finder that requires no monthly service fees. Designed for iOS users, this dog collar seamlessly integrates with the native ‘Find My’ app.
- ⚫🏷️Live Tracking & Location History – Keep an eye on your furry companion with our 2-in-1 GPS dog tracker collar. Quickly locate your pet anytime they roam or wander off. Plus, review their movement history to know where they’ve been and what they’ve explored.
- ⚫🏷️Adjustable Collar for a Perfect Fit – The BOMERAHE tracking collar is easy to customize: just measure your dog’s neck and trim the collar to size. Ideal for medium to large breeds.
- ⚫🏷️Durable, Lightweight & Waterproof Design – Crafted with a nylon strap and smooth PU surface, this collar is IP67 waterproof, protecting it against rain, snow, and moisture. Built to last through all your pet’s adventures.
- ⚫🏷️Anti-Loss Alerts & Apple Find My Compatibility – If your pet strays, your iPhone, Apple Watch, iPad, or Mac will notify you through the Find My network, helping to prevent loss or theft and keeping your furry friend safe.
Overview
- Brand : BOMERAHE
- Special Feature : Real Time Tracking, Location History, SOS
- Supported Application : Find My
- Specific Uses For Product : Dog Collar, Gps Tracker, Pet Tracking
- Material : Nylon, Polyurethane (PU)
Quantity
Couldn't load pickup availability
Share
