Skip to product information
1 of 9

MyLoc8

GPS Tracker for Vehicles with Magnet – 4G LTE Real-Time Location Device with App, Long Life Battery – Anti-Theft GPS Tracker for Car, Motorcycle, Scooter, Bike - (12-Mo Subscription Included)

GPS Tracker for Vehicles with Magnet – 4G LTE Real-Time Location Device with App, Long Life Battery – Anti-Theft GPS Tracker for Car, Motorcycle, Scooter, Bike - (12-Mo Subscription Included)

Regular price $179.92 USD
Regular price Sale price $179.92 USD
Sale Sold out
Shipping calculated at checkout.

About This

  • Enjoy peace of mind knowing your device comes with 12 months of subscription included. After 12 months, you can continue using the device with the flexible and transparent tariff plan you choose (check the product gallery to see the tariff plans).
  • Protect What Matters Most – Track your car, truck, or fleet in real time with our GPS tracker for vehicles. Get instant alerts on movement or unauthorized access, giving you peace of mind 24/7.
  • Stay in Control, Anywhere – Using our free iOS & Android app, view precise live locations anytime. The built-in SIM offers reliable 4G LTE tracking with flexible subscription plans
  • Discreet Yet Powerful – Our mini GPS tracker for vehicles is compact, waterproof (IP65), and easily hidden. Ideal as a car tracker device hidden from view for anti-theft protection No Tools Needed – Quick setup. Attach the device using strong magnets—no wiring, no hassle. Great for fleet tracking, teen drivers, or company vehicles
  • Long-Lasting Peace of Mind – Track for up to 14 days on a single charge. This tracking device for cars ensures uninterrupted monitoring when it matters most

Overview

  • Brand : MYLOC8
  • Special Feature : Alert Notification, Geo-Fence, Location History, Real Time Tracking, Weather Resistant
  • Connectivity Technology : 4G, Bluetooth, Wi-Fi
  • Supported Application : GPS (iOS, Android), Web Platform
  • Specific Uses For Product : Commercial GPS Tracking, Vehicle GPS Tracking, Worldwide GPS Tracking
Quantity
View full details